Topic ClosedMARINA DE ALBUFEIRA - 2nd phase works start March

 Post Reply Post Reply Page  12>
Author
Message Reverse Sort Order
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26506
Direct Link To This Post Topic: MARINA DE ALBUFEIRA - 2nd phase works start March
    Posted: 30/December/2019 at 15:02
Please see topic http://albufeira.com/forum/marina-phase-2-construction_topic5921.html for further updates.

This one now locked to avoid duplication.
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
Sponsored Links


Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26506
Direct Link To This Post Posted: 25/November/2018 at 19:04
Some pictures taken on Friday. It's still a bit of a wasteland around there and not much actually going on.

Some subsidence issues will need to be addressed!







The marble kerbstones are still there if you want some!
















Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26506
Direct Link To This Post Posted: 25/November/2018 at 09:29
Took some pictures on Friday, I hope to be to post them either later today or tomorrow. I also saw a truckload of rubble being delivered but nothing much else going on.
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26506
Direct Link To This Post Posted: 15/November/2018 at 08:37
Yes, I have been seeing stuff going on from out of my window. Time for a nose around I think and some pictures.
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
stuart123 View Drop Down
Newbie
Newbie


Joined: 21/October/2015
Status: Offline
Points: 195
Direct Link To This Post Posted: 14/November/2018 at 16:13
In October there was a lot of activity in the phase 2 area - thousands of tons of hardcore have been dumped to build up the level of the land - I suspect to the height of the "wall".

There are two trucks delivering loads every 20 mins and a bulldozer pushing it all around.

The wall has also been tided up and a lot of the rebar exposed - don't know if thats to demolish or to add to!
Back to Top
Gillian View Drop Down
Newbie
Newbie


Joined: 19/April/2017
Location: UK
Status: Offline
Points: 6
Direct Link To This Post Posted: 12/June/2017 at 13:02
Hi does anyone on this forum use Suzana da Silva as their lawyer? we have been trying for months to get any reply to e.mails from her. Rang several times always engaged tone. Would be grateful for any information re her or Oceanville. Thanks
Back to Top
Algarveaddick View Drop Down
Top Contributors
Top Contributors
Avatar

Joined: 27/December/2008
Location: Portugal
Status: Offline
Points: 5049
Direct Link To This Post Posted: 29/April/2017 at 09:57
When they said "next" March...
Go away Duchatalet
Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26506
Direct Link To This Post Posted: 28/April/2017 at 18:33
The scene a few days ago


Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
stuart123 View Drop Down
Newbie
Newbie


Joined: 21/October/2015
Status: Offline
Points: 195
Direct Link To This Post Posted: 24/April/2017 at 12:53
Here are a couple of images taken from the model in the marina offices - I don't think these are 100% correct as the existing site is not built to this model exactly.




Back to Top
stuart123 View Drop Down
Newbie
Newbie


Joined: 21/October/2015
Status: Offline
Points: 195
Direct Link To This Post Posted: 24/April/2017 at 12:44
Well a few months on, and not much has changed on Phase 2.

The blue fence has been removed, and hundreds of tons of soil have been piled up!

Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26506
Direct Link To This Post Posted: 26/February/2017 at 11:30
Oceanville was on sale for €1 if I recall correctly - plus the debts, permits and rebuilding cost!

I wonder who is going to occupy those 10,930 sq metres of housing?
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
pyrman View Drop Down
Top Contributors
Top Contributors
Avatar

Joined: 06/December/2012
Location: Kilmarnock, Sco
Status: Offline
Points: 1128
Direct Link To This Post Posted: 25/February/2017 at 13:58
Watch this space .... one might conclude the CM-Albufeira is having difficulty spending all the extra revenue coming from its recent tourist boom ... expect to see more tarting up .. they could buy Oceanville ..
Pyrman
Back to Top
stuart123 View Drop Down
Newbie
Newbie


Joined: 21/October/2015
Status: Offline
Points: 195
Direct Link To This Post Posted: 25/February/2017 at 08:54
This is what the phase 2 marina area looks like in Feb 2017...





A NEW MARINA DE ALBUFEIRA IS BEING BORN – 2ND STAGE

APPROVAL OF THE ALLOTMENT OPERATIONS OF THE 2ND STAGE OF THE RECREATIONAL PORT OF ALBUFEIRA DETAIL PLAN (MARINA DE ALBUFEIRA)

• On the 14th of February 2017 on a meeting at the City Hall of Albufeira, the allotment operations were approved allowing the issue of the Allotment Licenses of the 2nd stage of the Recreational Port of Albufeira Detail Plan (Marina de Albufeira).
• With the issue of the Allotment Licenses will be formed 36 lots with building permit of 10.930 m2 of construction meant for Housing, 22.379 m2 meant for Tourism Apartments, 13.060 m2 meant for commerce/Services and 26.680 m2 meant for Hotels.
• The construction work will start in March, being estimate to be concluded within a 8 month period.
• With the accomplishment of the 2nd Stage construction work the urban plan designed in 2007, by Professor Sidónio Pardal, will be concluded, predicting for the 2nd stage a lower construction density and compatibility between the green spaces, the water basins and the other equipments. The green spaces are dimensioned in order to allow their forestation. The detail plan includes 51% of green spaces and 21% of wet area and is compatible with the Albufeira Urban Plan and surrounding green structure, not covered by the last plan.


Back to Top
cubsur View Drop Down
Moderator Group
Moderator Group
Avatar

Joined: 26/January/2006
Status: Offline
Points: 26506
Direct Link To This Post Posted: 18/February/2017 at 17:07
 I have closed the previous item on this topic (http://www.albufeira.com/forum/marina-phase-2-construction_topic5921.html) with a redirect to here. And moved the topic from 'Works in the old Town' to a more appropriate location.

All contributions gratefully received as work progresses - or does not!
Albufeira Resident

www.algarvebus.info public transport information for the Algarve
Back to Top
stuart123 View Drop Down
Newbie
Newbie


Joined: 21/October/2015
Status: Offline
Points: 195
Direct Link To This Post Posted: 18/February/2017 at 16:58
I'll be glad if they get rid off or finish the "great wall" :-)


I'm flying over tomorrow so will see if anything has started.


Just noticed there is also a new laundry area (washing machines + spinners) in the marina.
Back to Top
 Post Reply Post Reply Page  12>