Topic: MARINA DE ALBUFEIRA - 2nd phase works start March
Posted By: stuart123
Subject: MARINA DE ALBUFEIRA - 2nd phase works start March
Date Posted: 16/February/2017 at 16:29

From Facebook

ESTÁ A NASCER UMA NOVA MARINA DE ALBUFEIRA - 2ª FASE

 APROVAÇÃO DAS OPERAÇÕES DE LOTEAMENTO DA 2ª FASE DO PLANO DE PORMENOR DO PORTO DE RECREIO DE ALBUFEIRA (MARINA DE ALBUFEIRA)

 • Em reunião da Câmara Municipal de Albufeira de 14 de Fevereiro de 2017, foram aprovadas as operações de loteamento que permitem a emissão dos Alvarás de Loteamento da 2ª fase do Plano de Pormenor do Porto de Recreio de Albufeira (Marina de Albufeira).

 

• Com a emissão dos Alvarás de Loteamento serão constituídos 36 lotes com permissão de edificação de 10.930 m2 de construção destinados a Habitação, 22.379 m2 destinados a Apartamentos Turísticos, 13.060 m2 destinados a comércios/Serviços e 26.680 m2 destinados a Hotéis.

 

• As obras de urbanização deverão iniciar-se no próximo mês de Março, devendo ficar concluídas no prazo de oito meses.

 

• Com a realização das obras da 2ª fase ficará concluído o plano urbanístico projetado em 2007, pelo Prof. Sidónio Pardal, o qual prevê para a segunda fase, uma menor densidade de construção e, quanto aos espaços verdes, uma compatibilização com os espelhos de água e demais equipamentos. Os espaços verdes estão dimensionados por forma a garantir a sua arborização. O plano de pormenor inclui 51% de espaços verdes e 21% de área molhada, encontra-se compatibilizado com o Plano de Urbanização de Albufeira e estrutura verde envolvente, não abrangida por este último.



Which I think translates roughly into:

  • 2nd phase of marina planning agreed with work to start in March 2017
  • Final phase of original 2007 plan
  • Mix of housing, apartments and retail shops
  • New 26,000m2 hotel
  • Road ways and pavements to be completed in 8 months
I'm not sure if they are actually building the apartments/buildings or just selling the planning permission/plots!

These are the original plans 

http://www.cm-albufeira.pt/sites/default/files/public/RepositorioDocumentos/plantaimplantacao.pdf" rel="nofollow - http://www.cm-albufeira.pt/sites/default/files/public/RepositorioDocumentos/plantaimplantacao.pdf




Replies:
Posted By: cubsur
Date Posted: 17/February/2017 at 08:39
8 months! Anyone want to bet? I will keep a watch on this.

-------------
Albufeira Resident

www.algarvebus.info public transport information for the Algarve


Posted By: pyrman
Date Posted: 17/February/2017 at 11:49
Great news for the city and marina area ...  and maybe an incentive to finish those half-built eyesores on the east side. From my reading, they will build the lake and infrastructure ... but it is just lots to be set out so far for the other stuff.


-------------
Pyrman


Posted By: Black Cat
Date Posted: 17/February/2017 at 14:57
We are over in April and September will have to compare the differences LOL


Posted By: tonisdad
Date Posted: 17/February/2017 at 15:40
Originally posted by pyrman pyrman wrote:

Great news for the city and marina area ...  and maybe an incentive to finish those half-built eyesores on the east side. From my reading, they will build the lake and infrastructure ... but it is just lots to be set out so far for the other stuff.

Hope so but no doubt it will be...I`ve started but I won`t finish.


Posted By: stuart123
Date Posted: 18/February/2017 at 16:58
I'll be glad if they get rid off or finish the "great wall" :-)


I'm flying over tomorrow so will see if anything has started.


Just noticed there is also a new laundry area (washing machines + spinners) in the marina.


Posted By: cubsur
Date Posted: 18/February/2017 at 17:07
 I have closed the previous item on this topic ( http://www.albufeira.com/forum/marina-phase-2-construction_topic5921.html" rel="nofollow - http://www.albufeira.com/forum/marina-phase-2-construction_topic5921.html ) with a redirect to here. And moved the topic from 'Works in the old Town' to a more appropriate location.

All contributions gratefully received as work progresses - or does not!


-------------
Albufeira Resident

www.algarvebus.info public transport information for the Algarve


Posted By: stuart123
Date Posted: 25/February/2017 at 08:54
This is what the phase 2 marina area looks like in Feb 2017...



http://imgur.com/k3BAvbz" rel="nofollow - http://imgur.com/k3BAvbz


A NEW MARINA DE ALBUFEIRA IS BEING BORN – 2ND STAGE

APPROVAL OF THE ALLOTMENT OPERATIONS OF THE 2ND STAGE OF THE RECREATIONAL PORT OF ALBUFEIRA DETAIL PLAN (MARINA DE ALBUFEIRA)

• On the 14th of February 2017 on a meeting at the City Hall of Albufeira, the allotment operations were approved allowing the issue of the Allotment Licenses of the 2nd stage of the Recreational Port of Albufeira Detail Plan (Marina de Albufeira).
• With the issue of the Allotment Licenses will be formed 36 lots with building permit of 10.930 m2 of construction meant for Housing, 22.379 m2 meant for Tourism Apartments, 13.060 m2 meant for commerce/Services and 26.680 m2 meant for Hotels.
• The construction work will start in March, being estimate to be concluded within a 8 month period.
• With the accomplishment of the 2nd Stage construction work the urban plan designed in 2007, by Professor Sidónio Pardal, will be concluded, predicting for the 2nd stage a lower construction density and compatibility between the green spaces, the water basins and the other equipments. The green spaces are dimensioned in order to allow their forestation. The detail plan includes 51% of green spaces and 21% of wet area and is compatible with the Albufeira Urban Plan and surrounding green structure, not covered by the last plan.




Posted By: pyrman
Date Posted: 25/February/2017 at 13:58
Watch this space .... one might conclude the CM-Albufeira is having difficulty spending all the extra revenue coming from its recent tourist boom ... expect to see more tarting up .. they could buy Oceanville ..


-------------
Pyrman


Posted By: cubsur
Date Posted: 26/February/2017 at 11:30
Oceanville was on sale for €1 if I recall correctly - plus the debts, permits and rebuilding cost!

I wonder who is going to occupy those 10,930 sq metres of housing?


-------------
Albufeira Resident

www.algarvebus.info public transport information for the Algarve


Posted By: stuart123
Date Posted: 24/April/2017 at 12:44
Well a few months on, and not much has changed on Phase 2.

The blue fence has been removed, and hundreds of tons of soil have been piled up!



Posted By: stuart123
Date Posted: 24/April/2017 at 12:53
Here are a couple of images taken from the model in the marina offices - I don't think these are 100% correct as the existing site is not built to this model exactly.






Posted By: cubsur
Date Posted: 28/April/2017 at 18:33
The scene a few days ago




-------------
Albufeira Resident

www.algarvebus.info public transport information for the Algarve


Posted By: Algarveaddick
Date Posted: 29/April/2017 at 09:57
When they said "next" March...

-------------
Go away Duchatalet


Posted By: Gillian
Date Posted: 12/June/2017 at 13:02
Hi does anyone on this forum use Suzana da Silva as their lawyer? we have been trying for months to get any reply to e.mails from her. Rang several times always engaged tone. Would be grateful for any information re her or Oceanville. Thanks


Posted By: stuart123
Date Posted: 14/November/2018 at 16:13
In October there was a lot of activity in the phase 2 area - thousands of tons of hardcore have been dumped to build up the level of the land - I suspect to the height of the "wall".

There are two trucks delivering loads every 20 mins and a bulldozer pushing it all around.

The wall has also been tided up and a lot of the rebar exposed - don't know if thats to demolish or to add to!


Posted By: cubsur
Date Posted: 15/November/2018 at 08:37
Yes, I have been seeing stuff going on from out of my window. Time for a nose around I think and some pictures.


-------------
Albufeira Resident

www.algarvebus.info public transport information for the Algarve


Posted By: cubsur
Date Posted: 25/November/2018 at 09:29
Took some pictures on Friday, I hope to be to post them either later today or tomorrow. I also saw a truckload of rubble being delivered but nothing much else going on.


-------------
Albufeira Resident

www.algarvebus.info public transport information for the Algarve


Posted By: cubsur
Date Posted: 25/November/2018 at 19:04
Some pictures taken on Friday. It's still a bit of a wasteland around there and not much actually going on.

Some subsidence issues will need to be addressed!

https://postimages.org/" rel="nofollow">

https://postimages.org/" rel="nofollow">

https://postimages.org/" rel="nofollow">

The marble kerbstones are still there if you want some!

https://postimages.org/" rel="nofollow">

https://postimages.org/" rel="nofollow">

https://postimages.org/" rel="nofollow">

https://postimages.org/" rel="nofollow">

https://postimages.org/" rel="nofollow">

https://postimages.org/" rel="nofollow">

https://postimages.org/" rel="nofollow">

https://postimg.cc/cKyqCNxH" rel="nofollow">


-------------
Albufeira Resident

www.algarvebus.info public transport information for the Algarve


Posted By: cubsur
Date Posted: 30/December/2019 at 15:02
Please see topic http://albufeira.com/forum/marina-phase-2-construction_topic5921.html" rel="nofollow - http://albufeira.com/forum/marina-phase-2-construction_topic5921.html for further updates.

This one now locked to avoid duplication.

-------------
Albufeira Resident

www.algarvebus.info public transport information for the Algarve